Lafarge North America

The Re-Systems Group Canada Ltd. was engaged by Lafarge to seal the 84 COB02 Pit.

Due to a combination of high tides and a high water table this coveryor pit was subjet to routine flooding due to seepage through the slab, walls and cold joints. As a consequence a mixture of cement powder spilled from the conveyor system and river water created a maintenance and safety issue.

An application of Turbo Seal U and repair mortars successfully solved this long term problem.

lafarge.jpg logo_lafargena.gif